Pre-engineered Metal Buildings

Pre-engineered Metal Buildings

Tedesco Construction Services has specialized in pre-engineered building systems since the company's predecessor, Fronteir Metal Buildings was founded in 1973 by Frank Tedesco Sr.  Over the past forty years we have developed a reputation for being the systems construction expert in the Buffalo/Niagara marketplace completing over 300 buildings throughout the region.  We provide the vision to effectively integrate pre-engineered metal building systems and conventional construction methods to deliver the highest quality commercial and industrial building projects.

With the advancements in the metal building industry over the past thirty years, pre-engineered metal building systems can be incorporated into virtually any low rise construction project to provide efficiencies.  

Some of the benefits of choosing a pre-engineered metal building system include:

  • The use of unobstructed clear spans ranging from 30' to 300' provides unsurpassed flexibility in the utilization of interior space
  • Savings of up to 30% in overall construction costs for certain building types in comparison to conventional construction methods
  • Construction time cycles can be reduced to 1/3 the time of alternative construction methods
  • Standardization allows for a more efficient design & code review process
  • Advanced computer design provides for enhanced project control and more accurate project cost estimating

Related Projects

Dollar General Niagara Falls

Dollar General Niagara Falls

Niagara Falls
Triad Recycling

Triad Recycling

Tonawanda, NY
Praxair - Fairfield

Praxair - Fairfield

Fairfield, AL
Dresser-Rand
NW Natural Gas
Kraftwerks
Unifrax
Duty Free Americas